Meridian Basin Resources
Aug 26 closed month
generated 20 Sep 2026 08:45 UTC
Demonstration. A fictional operator. Every number below is generated. Read-only — nothing here writes anywhere.

Production

Sagebrush Flats · Aug 26 closed

Gross
2,192.5MBOE
70,726 BOE/d
Net to us
1,851.6MBOE
after working interest
Water handled
4,275Mbbl
2.7 bbl per bbl of oil
Deferred
145,824bbl
8 workovers ran

Rate, 24 months — Sagebrush Flats

15,58617,93920,29322,64625,000Sep 24Jan 25May 25Sep 25Jan 26May 26Aug 26
A shale portfolio declines steeply on new wells and flattens on old ones. What matters is not the slope of any single well but whether new volume is being added faster than the base falls away.

Uptime, last 12 months

8696106115125Sep 25Dec 25Mar 26Jun 26Aug 26
Producing hours as a share of available hours, weighted by volume, so a big well going down counts more than a small one.

Stream mix, Aug 26

Oil1,604,976bblNatural gas469,723BOE from McfNGL117,818bbl
Gas shown in barrels of oil equivalent so the three streams are comparable. Gas is 21% of volume but far less of revenue — see Financials.

Biggest producers, Aug 26

WellFieldLiftLateral BOE/dUptimeWater Op cost /BOEWI
Antelope 3-12H
42-404-30335
Antelope Draw Plunger lift 15,000 ft 1,607 99% 54.4k $6.91 82.9%
Rimrock 1-4H
43-489-30409
Rimrock North Plunger lift 15,000 ft 1,489 94% 49.6k $5.05 66.5%
Cottonwood 7-28H
49-136-30356
Cottonwood Bend Flowing 15,000 ft 1,427 97% 37.4k $6.20 80.0%
Antelope 5-20H
42-231-30391
Antelope Draw Plunger lift 15,000 ft 1,407 97% 47.8k $8.54 88.2%
Antelope 10-39H
42-380-30524
Antelope Draw Plunger lift 15,000 ft 1,088 95% 44.0k $5.27 86.7%
Antelope 1-2H
42-311-30265
Antelope Draw Rod pump 10,000 ft 1,058 94% 29.2k $8.76 92.3%
Cottonwood 3-9H
49-488-30223
Cottonwood Bend Gas lift 15,000 ft 1,031 100% 33.4k $5.97 78.5%
Antelope 16-62H
42-430-30685
Antelope Draw Flowing 15,000 ft 1,019 95% 42.4k $7.91 83.8%
Rimrock 3-9H
43-120-30444
Rimrock North Rod pump 10,000 ft 999 98% 29.4k $7.56 68.1%
Sagebrush 8-29H
42-255-30363
Sagebrush Flats ESP 12,400 ft 937 98% 29.6k $5.80 96.3%
Rimrock 2-8H
43-352-30437
Rimrock North Plunger lift 7,500 ft 916 93% 23.3k $5.60 67.1%
Antelope 7-28H
42-471-30447
Antelope Draw Gas lift 10,000 ft 910 97% 26.5k $5.43 90.9%

Wells to look at

WellFieldPadFlag BOE/dUptimeCost /BOE Deferred
Antelope 12-47H
42-157-30580
Antelope Draw ANT-PAD-12 Workover this month 65 61% $56.17 898 bbl
Sagebrush 2-8H
42-289-30216
Sagebrush Flats SGB-PAD-02 Workover this month 290 56% $24.61 4,551 bbl
Sagebrush 11-43H
42-290-30461
Sagebrush Flats SGB-PAD-11 Workover this month 227 58% $22.82 3,463 bbl
Mesquite 5-17H
42-391-30539
Mesquite Ridge MQR-PAD-05 Workover this month 185 56% $19.98 2,920 bbl
Sagebrush 1-3H
42-383-30181
Sagebrush Flats SGB-PAD-01 Workover this month 177 60% $17.00 2,703 bbl
Rimrock 1-2H
43-289-30395
Rimrock North RMN-PAD-01 Workover this month 584 63% $13.38 8,428 bbl
Cottonwood 8-29H
49-373-30363
Cottonwood Bend CWB-PAD-08 Workover this month 527 56% $9.05 10,055 bbl
Antelope 13-50H
42-249-30601
Antelope Draw ANT-PAD-13 Workover this month 637 86% $9.74 2,608 bbl
Mesquite 2-7H
42-143-30469
Mesquite Ridge MQR-PAD-02 Water handling 119 91% $12.31 262 bbl
Sagebrush 1-1H
42-481-30167
Sagebrush Flats SGB-PAD-01 Water handling 246 92% $11.33 451 bbl
Cost per barrel rises on old wells even when nothing has broken: the barrels fall away faster than the fixed monthly cost of running the location, and water handling climbs the whole time. That is why this list is ranked on cost and uptime together rather than on either alone.