Meridian Basin Resources
Sep 26 closed month
generated 04 Nov 2026 23:36 UTC
Demonstration. A fictional operator. Every number below is generated. Read-only — nothing here writes anywhere.

Production

Antelope Draw · Sep 26 closed

Gross
2,160.2MBOE
72,007 BOE/d
Net to us
1,821.7MBOE
after working interest
Water handled
4,205Mbbl
2.7 bbl per bbl of oil
Deferred
114,999bbl
4 workovers ran

Rate, 24 months — Antelope Draw

16,56819,92623,28426,64230,000Oct 24Feb 25Jun 25Oct 25Feb 26Jun 26Sep 26
A shale portfolio declines steeply on new wells and flattens on old ones. What matters is not the slope of any single well but whether new volume is being added faster than the base falls away.

Uptime, last 12 months

8897106116125Oct 25Jan 26Apr 26Jul 26Sep 26
Producing hours as a share of available hours, weighted by volume, so a big well going down counts more than a small one.

Stream mix, Sep 26

Oil1,579,324bblNatural gas463,328BOE from McfNGL117,568bbl
Gas shown in barrels of oil equivalent so the three streams are comparable. Gas is 21% of volume but far less of revenue — see Financials.

Biggest producers, Sep 26

WellFieldLiftLateral BOE/dUptimeWater Op cost /BOEWI
Antelope 3-12H
42-404-30335
Antelope Draw Plunger lift 15,000 ft 1,580 97% 49.6k $7.06 82.9%
Rimrock 1-4H
43-489-30409
Rimrock North Plunger lift 15,000 ft 1,559 98% 41.8k $5.26 66.5%
Cottonwood 7-28H
49-136-30356
Cottonwood Bend Flowing 15,000 ft 1,411 96% 28.5k $6.53 80.0%
Antelope 5-20H
42-231-30391
Antelope Draw Plunger lift 15,000 ft 1,375 93% 43.4k $7.40 88.2%
Antelope 10-39H
42-380-30524
Antelope Draw Plunger lift 15,000 ft 1,116 97% 46.7k $5.82 86.7%
Antelope 1-2H
42-311-30265
Antelope Draw Rod pump 10,000 ft 1,088 96% 24.9k $8.04 92.3%
Antelope 16-62H
42-430-30685
Antelope Draw Flowing 15,000 ft 1,052 96% 47.9k $8.83 83.8%
Cottonwood 3-9H
49-488-30223
Cottonwood Bend Gas lift 15,000 ft 1,031 100% 27.7k $4.82 78.5%
Rimrock 3-9H
43-120-30444
Rimrock North Rod pump 10,000 ft 988 99% 25.3k $7.29 68.1%
Sagebrush 8-29H
42-255-30363
Sagebrush Flats ESP 12,400 ft 950 97% 29.7k $5.59 96.3%
Cottonwood 8-29H
49-373-30363
Cottonwood Bend Plunger lift 15,000 ft 927 97% 31.3k $6.19 78.0%
Rimrock 1-2H
43-289-30395
Rimrock North Gas lift 9,800 ft 902 96% 29.5k $7.63 66.3%

Wells to look at

WellFieldPadFlag BOE/dUptimeCost /BOE Deferred
Sagebrush 4-13H
42-412-30251
Sagebrush Flats SGB-PAD-04 Workover this month 203 63% $19.97 2,316 bbl
Antelope 8-29H
42-495-30454
Antelope Draw ANT-PAD-08 Workover this month 169 73% $25.50 1,266 bbl
Antelope 2-8H
42-336-30307
Antelope Draw ANT-PAD-02 Workover this month 310 62% $14.62 4,552 bbl
Sagebrush 6-23H
42-288-30321
Sagebrush Flats SGB-PAD-06 Workover this month 229 78% $21.93 1,412 bbl
Mesquite 2-7H
42-143-30469
Mesquite Ridge MQR-PAD-02 Water handling 119 91% $11.86 250 bbl
Antelope 9-34H
42-483-30489
Antelope Draw ANT-PAD-09 Water handling 133 93% $13.24 181 bbl
Antelope 7-26H
42-361-30433
Antelope Draw ANT-PAD-07 Water handling 148 93% $12.31 241 bbl
Sagebrush 1-1H
42-481-30167
Sagebrush Flats SGB-PAD-01 Water handling 249 93% $11.84 383 bbl
Antelope 4-16H
42-395-30363
Antelope Draw ANT-PAD-04 Water handling 157 90% $10.08 370 bbl
Antelope 1-1H
42-185-30258
Antelope Draw ANT-PAD-01 Water handling 164 93% $11.73 259 bbl
Cost per barrel rises on old wells even when nothing has broken: the barrels fall away faster than the fixed monthly cost of running the location, and water handling climbs the whole time. That is why this list is ranked on cost and uptime together rather than on either alone.