Meridian Basin Resources
Jul 26 closed month
generated 06 Aug 2026 07:33 UTC
Demonstration. A fictional operator. Every number below is generated. Read-only — nothing here writes anywhere.

Production

Mesquite Ridge · Jul 26 closed

Gross
2,202.5MBOE
71,048 BOE/d
Net to us
1,860.7MBOE
after working interest
Water handled
4,281Mbbl
2.7 bbl per bbl of oil
Deferred
140,823bbl
8 workovers ran

Rate, 24 months — Mesquite Ridge

6,5668,0499,53311,01612,500Aug 24Dec 24Apr 25Aug 25Dec 25Apr 26Jul 26
A shale portfolio declines steeply on new wells and flattens on old ones. What matters is not the slope of any single well but whether new volume is being added faster than the base falls away.

Uptime, last 12 months

8696106115125Aug 25Nov 25Feb 26May 26Jul 26
Producing hours as a share of available hours, weighted by volume, so a big well going down counts more than a small one.

Stream mix, Jul 26

Oil1,609,977bblNatural gas472,322BOE from McfNGL120,192bbl
Gas shown in barrels of oil equivalent so the three streams are comparable. Gas is 21% of volume but far less of revenue — see Financials.

Biggest producers, Jul 26

WellFieldLiftLateral BOE/dUptimeWater Op cost /BOEWI
Antelope 3-12H
42-404-30335
Antelope Draw Plunger lift 15,000 ft 1,626 100% 47.0k $6.54 82.9%
Rimrock 1-4H
43-489-30409
Rimrock North Plunger lift 15,000 ft 1,467 91% 38.7k $4.88 66.5%
Cottonwood 7-28H
49-136-30356
Cottonwood Bend Flowing 15,000 ft 1,418 97% 34.1k $6.67 80.0%
Antelope 5-20H
42-231-30391
Antelope Draw Plunger lift 15,000 ft 1,381 96% 46.4k $8.04 88.2%
Antelope 1-2H
42-311-30265
Antelope Draw Rod pump 10,000 ft 1,120 98% 27.6k $7.80 92.3%
Antelope 10-39H
42-380-30524
Antelope Draw Plunger lift 15,000 ft 1,105 95% 42.8k $5.13 86.7%
Antelope 16-62H
42-430-30685
Antelope Draw Flowing 15,000 ft 1,032 95% 44.0k $9.02 83.8%
Cottonwood 3-9H
49-488-30223
Cottonwood Bend Gas lift 15,000 ft 997 97% 31.6k $5.65 78.5%
Rimrock 3-9H
43-120-30444
Rimrock North Rod pump 10,000 ft 941 92% 24.0k $7.41 68.1%
Sagebrush 8-29H
42-255-30363
Sagebrush Flats ESP 12,400 ft 915 96% 28.4k $5.55 96.3%
Cottonwood 8-29H
49-373-30363
Cottonwood Bend Plunger lift 15,000 ft 905 96% 37.0k $6.65 78.0%
Sagebrush 2-7H
42-166-30209
Sagebrush Flats Gas lift 10,000 ft 893 100% 30.5k $5.92 88.1%

Wells to look at

WellFieldPadFlag BOE/dUptimeCost /BOE Deferred
Mesquite 2-7H
42-143-30469
Mesquite Ridge MQR-PAD-02 Workover this month 101 77% $50.11 626 bbl
Cottonwood 1-2H
49-413-30174
Cottonwood Bend CWB-PAD-01 Workover this month 152 59% $25.78 2,276 bbl
Cottonwood 1-3H
49-335-30181
Cottonwood Bend CWB-PAD-01 Workover this month 148 64% $28.27 1,681 bbl
Sagebrush 8-32H
42-140-30384
Sagebrush Flats SGB-PAD-08 Workover this month 298 55% $16.39 5,324 bbl
Rimrock 2-8H
43-352-30437
Rimrock North RMN-PAD-02 Workover this month 491 50% $12.88 11,991 bbl
Sagebrush 3-11H
42-286-30237
Sagebrush Flats SGB-PAD-03 Workover this month 248 67% $15.08 2,477 bbl
Cottonwood 5-20H
49-468-30300
Cottonwood Bend CWB-PAD-05 Workover this month 273 85% $24.99 1,104 bbl
Antelope 7-27H
42-117-30440
Antelope Draw ANT-PAD-07 Workover this month 252 73% $11.74 2,131 bbl
Antelope 9-34H
42-483-30489
Antelope Draw ANT-PAD-09 Water handling 133 94% $12.26 164 bbl
Antelope 15-57H
42-207-30650
Antelope Draw ANT-PAD-15 Water handling 154 95% $12.49 181 bbl
Cost per barrel rises on old wells even when nothing has broken: the barrels fall away faster than the fixed monthly cost of running the location, and water handling climbs the whole time. That is why this list is ranked on cost and uptime together rather than on either alone.